Kickstart Disclaimer & Instructions
Remember: The information contained herein is, to the best of our knowledge and belief, accurate. However, since handling conditions and use are beyond our control, we make no guarantee of results, and assume no liability for damages incurred by use of this material. Concrete Pump Supply LLC responsibility for any claim arising out of breach of warranty, negligence, and strict liability or otherwise is limited to the purchase price of the materials.
Instructions For 2oz. Container
- Shake before using.
- Pour the entire bottle into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
- Pour the entire bottle into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
Instructions For 4oz. Container
**Note - 2 Primes Per Bottle**
**Note - 2 Primes Per Bottle**
Prime #1
- Shake before using.
- Pour approximately half of the bottle (right below the light blue line) into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
- Pour approximately half of the bottle (right below the light blue line) into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
Prime #2
- Shake before using.
- Pour the remainder of the bottle (right below the orange line) into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
- Pour the remainder of the bottle (right below the orange line) into a large bucket or hopper, filled with 5 gallons of water.
- Mix for 2 minutes and let stand.
- Add mix ahead of concrete.
Guidelines For Use
- Promote a clean, effective work environment by following safe workplace regulations.
- Follow appropriate Federal, State, and local regulatory agency guidelines if/when disposing of the prime.